The operation of the HiRECORD pilot plant took place at CAO Natural Chemicals in Volos, Greece, within May–June 2026 and was completed successfully.
📅 Period: May–June 2026
📍 Site: CAO Natural Chemicals, Volos, Greece
✅ Status: Successfully completed
The pilot plant
In a world’s first, HiRECORD demonstrates a CO₂ capture plant based on intensified Rotating Packed Bed technology, combined with an advanced solvent:
- ✓10 t/d CO₂ capture capacity
- ✓Rotating Packed Bed (RPB) absorber and desorber
- ✓Advanced APBS-CDRMax solvent
- ✓Demonstration in a real industrial environment
Targeted outcomes
up to 50%
lower capture cost
up to 10×
smaller footprint
up to 45%
less regeneration energy



